June 23

THE NAUTILUS

0  comments

Work is underway to repair the Nautilus apartment building in Orewa, which is affected by weather-tightness issues. Prendos has designed and is managing the project. The repair work – which is expected to take two years – is being carried out by Legacy Construction.


Tags


You may also like

Case Study: CCC Wellhead Upgrade Pre-Condition Surveys

Case Study: CCC Wellhead Upgrade Pre-Condition Surveys

Case Study: ANZ Centre

Case Study: ANZ Centre
{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

Use this Bottom Section to Promote Your Offer

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim