Work is underway to repair the Nautilus apartment building in Orewa, which is affected by weather-tightness issues.

Prendos has designed and is managing the project. The repair work – which is expected to take two years –  is being carried out by Legacy Construction.

Click here for a full explanation of the repair project and and the planned usage of the Orewa Public Library carpark.

You may also like

Case Study: CCC Wellhead Upgrade Pre-Condition Surveys

Case Study: CCC Wellhead Upgrade Pre-Condition Surveys

Case Study: ANZ Centre

Case Study: ANZ Centre

Project Rescue & Recovery

Project Rescue & Recovery

Meet with us

If you’d like to talk to us about an existing building, new build project or future property venture, get in touch. We’d love to find out more about your objectives and help you achieve the best possible property solution.

Contact Us.

Phone.
0800 PRENDOS
(
0800 773 636)

Email.
[email protected]

Business Hours.
Monday-Friday
9am - 5pm

  • This field is for validation purposes and should be left unchanged.

Copyright 2021, All Right Reserved

Prendos New Zealand Limited